An industrial manufacturer of large diameter PE tubes was identified. An audit of the line showed it could produce the desired dimension.
Since the staff did not have experience in fluorinated product extrusion, SCIPROD became the operator of the line during the production. After acquiring the raw material, a first production trial of a small diameter tube was done to validate the process and calculate the size of the tools required for the final product.
Once the die and the spinneret were manufactured, the production of the samples was initiated.